The general public works minister mentioned the ability outage had been attributable to the failure of a key transmission line. Inside hours, energy had begun to be restored to the nation of 18 million.
The general public works minister mentioned the ability outage had been attributable to the failure of a key transmission line. Inside hours, energy had begun to be restored to the nation of 18 million.